|
as elevated tanks or low-level tanks - rainwater overflow basin
- sprinkler tanks
- biogas plants
- fire water
- slurry
|  | | With new filling and jolting technique the building of water storage tanks is realisable easier, faster and with higher quality. "With G+K the drudgery is finally over. And the quality is better than ever before." |  | Tank formwork for elevated or low-level tanks With conventional formwork systems it tooks often days - for large container even weeks - until concreting. With variable adjustable diameters of our "maximum large area framwork" by G+K the positioning just tooks a few hours. |  | | A automotive distribution vehicle assists by filling the wall. This uniform filling method makes formwork spaces needless - leakages can not arise. Automated jolting guarantees perfectly compressed walls. This is prerequisite for corrosion pretection and long durability also for aggressive liquids. "Automated packing guarantees a homogenous watertight concrete shell." | |
|